Water Supply UPVC Plastic Fitting Sch40 90 Deg Elbow NSF Certificate PVC Fitting
Package Size 50.00cm * 30.00cm * 27.00cm Package Gross Weight 18.900kg Water Supply UPVC plastic fitting Sch40 Standard
Send your inquiryDESCRIPTION
Basic Info.
Model NO. | D02 |
Shape | Reducing Tee |
Lateral | 90°Tee |
Head Code | Round |
Wall Thickness | SCH40 |
Technics | Injection |
Pressure Rating | Pn16 |
Standard | ANSI |
Certification | NSF61 |
Temperature Resistance | 0-65degree Centigrade |
Transport Package | Carton |
Specification | 1/2" 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" |
Trademark | HJ |
Origin | Huangyan |
HS Code | 39174000 |
Packaging & Delivery
Package Size 50.00cm * 30.00cm * 27.00cm Package Gross Weight 18.900kgProduct Description
Water Supply UPVC plastic fitting Sch40 Standard Reducing Tee PVC Pipe FittingsPVC Plastic fitting 90 Degree Elbow is a pipe fitting used to connect two pieces of pipe of the same diameter to form an angle of 90 degrees.
Moreover, it is completely odorless and does not change the taste of fluids, becoming the ideal material for drinking water conduits or in those installations which manage food liquids. The absence of porosity eases the flow of fluids and prevents any deposit formation.
Pressure ratings for plastic pipework systems are always quoted at 20 ° C, it is a fundamental principle of such systems that if the temperature is increased then the pressure rating must be reduced. PVC-U systems should never be used for temperatures in excess of 60 ° C.All fittings are WRAS approved for use with potable water.
1 Material:PVC
2 COLOR:any color
3 SIZE:20mm,25mm,32mm etc
4 STANDARD:Sch40
5 MADE IN CHINA
6 BRAND:OEM
1.Are you a manufacture or a Trade Company?
We are professional manufacturer founded in 2003.
2.What's the order process?
1.Inauiry---provide us all ciear reauirements (total qty and packae details).
2.Quotation---official quotation from with all clear specifications from our professional team.
3.Making Sample---confirm all quotation details and the final sample.
4.Payment terms---T/T 30% deposit before production, 70% balance against copy of BOL.
5.Production---mass production.
6.Shipping---by sea or by air.
3.What terms of payment you use?
As for the payment terms, it depends on the total amount. Pis check below:
1) Payment Method:T/T or Paypal.
2)Total amount is less than USD$2000, 100% pre-paid by T/T. In this way, the buyer could avoid second time bank
handling charge.
3)Total amount is over USD$2000, T/T 30% deposit before production, 70% balance against copy of BOL.
4) Other possible situation: sample fee and mould charge(OEM services).
Related Products
-
SS304 316 Stainless Steel Handle with Locking Internal Thread BSPP BSPT NPT 2PC Ball Valve
-
Australia Standard (AS/NZS2053) UPVC / PVC Plastic Pipe / Conduit & Fittings with Sai Certification
-
(CPVC /PVC) Plastic Drainage Waste Pipe with GB ASTM Standard
-
CPVC Pipe of DIN Pn16 400mm Plastic Socket Welding Pipes Dark Grey Tube for Water System